The Dam Road between Flower Mound and Grapevine has reopened.
Micro seal and restriping of Fairway Drive across the Grapevine Lake Dam are complete, according to the U.S. Army Corps of Engineers. Downstream embankment slope repairs are complete and the Dam continues to function as intended providing flood risk management, water supply and recreation opportunities.
The City of Grapevine will restrict all commercial truck traffic regardless of size or weight on Fairway Drive from Flower Mound to State Highway 26.
The road, which goes over Grapevine Dam between Flower Mound and Grapevine, was shut down in August 2018 due to potentially hazardous conditions on the road observed during a routine inspection after heavy rainfall, according to the U.S. Army Corps of Engineers. It was originally expected to be repaired and re-opened by the end of 2018.